What is the commissioning operation of the coal mining scraper conveyor? Let me introduce you.
1. Precautions during the trial operation of the coal mining scraper conveyor After the scraper conveyor is installed, you should further check whether the components are installed correctly, whether the bolts are firm, and whether the lubrication system oil is sufficient, and then conduct no-load experiments.
2. Intermittent jog at the beginning, start and stop trial operation. First check whether the upper and lower machine heads are running in the correct direction; then start and stop the test operation to check whether there is any jamming of each part. After the scraper chain of the coal mining scraper conveyor has been rotated for 1 to 2 cycles, carefully check whether the connections of the various parts of the scraper chain are correct, and supplement the missing scrapers; then run dry for 10-15 minutes, and then further check the conditions of each part, tighten if necessary Scraper chain at a time.
3. After dry running is confirmed that there is no problem, it can be operated with load. In order to ensure the tightening of the bolts, after a shift, all bolts and nuts must be tightened again, and then checked and accepted according to the prescribed procedures, and then delivered for use.