1. The Mechanical and Electrical Department implements unified management of the chain scraper conveyor chain of the entire mine, and is mainly responsible for the management of receipt, distribution, and recovery, and implements registration procedures, and checks accounts and materials.
2. Every time a chain scraper conveyor is dismantled, if it is not used in the mine temporarily, the user should level the tank, large chain and accessories, and go through the relevant cancellation procedures at the Electrical and Mechanical Services Department. For the missing or missing parts, the dismantling unit shall be based on the original price. Double compensation. The Electrical and Mechanical Services Department checks once a month, and the penalty for loss is honored in the month.
3. One day before the relocation of the mining surface, the Electrical and Mechanical Services Department should go to the site for inspection and acceptance together with related units. It is found that the scraper chain conveyor has parts missing. The original user shall be responsible for compensation. If the dismantling unit dismantles the lifted well after the parts are lost or damaged, the dismantling unit shall be responsible for compensation .
4. The consumption of the large chain of the scraper chain conveyor is 2%, and the consumption of the connecting ring is 10%.