Coal mining scraper conveyor is an ideal continuous conveying equipment with high efficiency in the sand and gravel plant. Compared with other conveying equipment (such as electric locomotive), it has the advantages of long conveying distance, large transportation volume, continuous conveying, etc., and reliable operation, which is easy to complete automation technology and centralized operation.
Operating procedures for coal mining scraper conveyors
1. Before the coal mining scraper conveyor officially starts working, it needs to carry out idle operation, with a time control of 3-5 minutes. During this period, check if there are any abnormalities in the motor and rotating parts, whether the buffering roller rotates flexibly, and whether the conveyor belt has any deviation or direction deviation.
2. First run at full load, and then only after normal operation can the actual loading operation be carried out. It is decisively not allowed to discharge the material before running to prevent problems from occurring.
3. The operation status of mechanical equipment should be observed anytime and anywhere. Once abnormal conditions are found in the conveyor belt, adjustment or maintenance should be immediately terminated.
4. During the operation of the coal mining scraper conveyor, it is not allowed to cross from the top or bottom of the conveyor belt.
If transporting bulk raw materials, safety devices should be installed to ensure safety.
When the coal mining scraper conveyor is shut down, first disconnect the power supply of the switch, and then carry out the solution.
7. It is not possible to shut down the machine until all the raw materials have been unloaded, and then cut off the power supply of the machine equipment switch.