What is the preparatory work before the installation of the coal mining scraper conveyor, let me introduce it to you.
(1) The staff participating in the installation and trial operation should carefully read the manual of the coal mining scraper conveyor, the manual of the supporting equipment and other relevant technical data, safety regulations, and be familiar with the structure, working principle, installation procedures and precautions of the machine;
(2) Check whether the form and capacity of the coal mining scraper conveyor are compatible with the working conditions;
(3) According to the delivery schedule and technical data of the coal mining scraper conveyor, check all the parts, accessories, spare parts and special tools of the whole machine one by one;
(4) According to the technical data of the coal mining scraper conveyor, check the appearance quality and geometric shape of all parts and components. If there are bruises, deformations, and rusts, they should be repaired and derusted. Especially for explosion-proof equipment, it must be inspected by a full-time explosion-proof inspector and issued with a permit to go down the well;
(5) Prepare installation tools and lubricating grease;
In order to check the mechanical performance of the coal mining scraper conveyor, so that the installation and maintenance and operators are proficient in, installation, repair and operation technology, it is best to install and debug on the ground, and then go down to the well after it is deemed that there is no problem.