The removal of the coal mining scraper conveyor is performed after the withdrawal channel is completed. First, the scraper chain and the scraper are removed, and after being loaded and transported from the machine lane, the middle groove and the frame of the front scraper conveyor use inclined platforms The main and auxiliary winches are used for hauling, and they are directly loaded and transported on the working surface from the wind tunnel; the rear conveyor is recovered in two sections at the same time. Open the scraper chain at the head transition slot, lock the head motor to power the tail motor, and the tail motor forwards to spit out all the scraper chains and manually pull it to the coal wall side to install it from the machine lane the car was shipped out.
After the tail of coal mining scraper conveyor is dismantled, it is dismantled by using the roadway winch under the lifting device, the transmission part is removed, and the vehicles are loaded respectively. The specific method for loading the vehicle is to use two inverted chains to lift the two ends of the component and lift them at a certain height, and then push the flatbed vehicle into the equipment to load the vehicle. When bundling, each vehicle is bundled no less than 6 and each location is no less than 6 shares 8 # The lead wire is tightly bound, that is, the 8 # lead wire is used for binding and fixing at the four corners, and then two Φ18.5mm steel wire rope buckles are used to cross-bundle diagonally with the flower bar screws.