The problems found in the operation of the coal mining scraper conveyor should be handled by the squad leader and electric fitter. After solving the problem, first send a stop signal, pull the handle of the control switch to the power off position and lock it, and then suspend the power card. When the operation starts, a power-on signal will be issued. After opening the front coal mining scraper conveyor, activate it twice, and then start it officially, then turn on the sprinkler switch. Only the correct operation of the coal mining scraper conveyor can reduce the frequency of failure of the coal mining scraper conveyor during operation.
Coal mining scraper conveyor can be extended to various industrial and mining materials, most of which can reduce the amount of cleaning. It has the functions of cleaning and continuous cleaning. It can remain stable and close to the rated productivity, and can reach 55% of the rated productivity. 70%, while the average efficiency of other conveyors is only 40%-50%. This balanced operating characteristic is very important for the matching of the rear conveyor system. Various mechanical continuous conveyors consume less energy than grab conveyors.
1. Do not work when the working environment or material temperature is below -10 degrees and above 50 degrees.
2. Do not walk or take people on the conveyor belt of the coal mining scraper conveyor to avoid personal injury.
3. Please do not transport acid-base or material pipe chain type scraper conveyor containing machine components.
4. If tape deviation occurs during operation, it should be adjusted in time for parking, and do not force it to avoid increased friction.
5. When there is a problem with the insulation of the conveyor belt of the coal conveyor, it is necessary to stop the processing, and the motor must be grounded to avoid leakage.