Electronic equipment or mechanical equipment, general operators must obtain certain qualifications. Today, I will share the operation and debugging of the chain scraper conveyor!
1. The chain scraper conveyor should be fixedly installed according to the specified installation method. Before the chain scraper conveyor is officially in operation, the wheels should be wedged or braked with triangular timber. In order to avoid walking at work, when there are multiple conveyors working in parallel, there should be one meter between machines.
2. Before using the chain scraper conveyor, check whether the running parts, the tape buckle and the carrying device are normal, and whether the protective equipment is complete. Before starting, the tape tension must be adjusted to an appropriate level.
3. The scraper chain conveyor should be started when there is no load. After normal operation, it can be fed. It is forbidden to drive after entering the material first.
4. When multiple scraper chain conveyor run in series, they should start from the discharge end and start in sequence. The material can only be fed after all normal operations.
The scraper chain conveyor must be well insulated. Do not pull and drag the conveyor cable. The motor must be reliably grounded.